Licensed General Contractor · CSLB #1074934
ADU Builder & Home Additions in Pasadena & the San Gabriel Valley, CA
Garage conversions, attached additions and detached ADUs, priced around the utility runs and the ground, not just the floor plan.
Direct Answer · Pasadena & San Gabriel Valley
The biggest thing that decides an ADU job is what you cannot see on the floor plan: how far water, sewer, gas, and power have to run to the new space, and whether your electrical panel can carry the added load. Type sets the baseline. A garage conversion is cheapest because the shell exists, an attached addition sits in the middle, and a detached new build costs the most. We build these across Pasadena and the San Gabriel Valley.
Home Additions & ADUs Scope & EngineeringGarage conversions vs. detached ADUs, utility runs & city plan check.
Type and utility runs set the number
Start with type. A garage conversion reuses the existing shell, so it is the cheapest way in. An attached addition sits in the middle, and a detached new build runs highest because you are pouring a full foundation and framing from dirt up. After that, the money hides in the utility runs. The farther water, sewer, gas, and power have to travel to reach the new space, the more you dig and pay. If your panel cannot carry the added load, an upgrade gets added too.
The San Gabriel Valley ground under it
Foundation type follows the soil, and a lot of this valley sits on expansive clay that swells when wet and shrinks when dry. That movement drives how the footings get designed, so we do not guess it. A flat lot may take a slab, a raised floor suits some homes, and a real slope can call for caissons drilled down to stable ground. Grading a lot or building a new foundation is real money, which is why we look hard at the ground before we price anything.
Permits run city by city
California loosened ADU rules statewide, with ministerial approval, lighter parking rules, and set size allowances. That helps. But every city still runs its own plan check with its own setback, height, and floor-area rules, so Pasadena and its neighbors will not read the same. If your parcel is unincorporated, you permit through LA County instead. And an addition that changes the roofline or the street-facing front in a historic district can trigger design review. We confirm your exact rules before design.
2026 ADU Builder & Home Addition Cost Breakdown in Pasadena & San Gabriel ValleyLine-by-line scope, permits & realistic 2026 pricing.
Every home additions & adus project across Pasadena (91101–91107), Altadena (91001), South Pasadena (91030), San Marino (91108), and Arcadia (91006–91007) is quoted after an on-site walkthrough by owner Michael Ward. Use the 2026 cost and scope table below to compare project tiers before your estimate.
| ADU / Addition Build Type | Typical 2026 SGV Price Range | Foundation, Framing & Utility Trenching Scope | Plan Check & Build Timeline |
|---|---|---|---|
| 2-Car Garage Conversion ADU (360 – 450 sq ft Studio / 1-Bed) | $95,000 – $145,000 | Structural footing underpinning where required, vapor barrier slab prep, R-value wall/roof insulation, sewer lateral tie-in, water/power trenching, mini-split HVAC, full kitchen & 3/4 bath. | 3 – 4 Months build (after ministerial ADU permit) |
| Attached Room Addition / Primary Suite Expansion (300 – 600 sq ft) | $135,000 – $225,000 | Expansive clay footing excavation, raised floor or stem-wall slab tied to existing structure, roofline integration matching Craftsman or Spanish Revival eaves, stucco/paint match & 200A panel upgrade. | 4 – 6 Months build + city plan check |
| Detached Ground-Up Backyard ADU (600 – 1,000 sq ft 1–2 Bed) | $220,000 – $385,000+ | Full site grading, engineered foundation (slab-on-grade or hillside caissons), 50–120 ft utility trenching (sewer, water, electrical), Title 24 solar-ready roof, full kitchen, laundry & bathroom. | 6 – 8 Months build + ministerial permit |
All home additions & adus work by MKW Homes Inc (CSLB #1074934) includes a written 3-year labor warranty and one dedicated four-person crew from start to finish.
Home Additions & ADUs by City & Permit JurisdictionPasadena, Altadena, South Pasadena, San Marino & Arcadia.
We also provide home additions & adus in Sierra Madre, Monrovia, Alhambra, Temple City, La Crescenta, Bradbury. Request an estimate below for those areas.
Home Additions & ADUs FAQs2026 Pasadena & San Gabriel Valley costs, permits & timelines.
Is a garage conversion cheaper than building a detached ADU?
Usually yes. A garage conversion reuses the existing shell, walls, and roof, so you skip a new foundation and framing. A detached ADU is built from the ground up, which costs the most. An attached addition lands between the two. Utility runs still swing the final number.
Will we need to upgrade our electrical panel for an ADU?
Sometimes. It depends on what your current panel can carry and the load the new kitchen, heating, and outlets add. If there is no room left, an upgrade gets built in. We check the existing panel on the walk so it is not a surprise later on the bill.
Do we still need a permit if California relaxed the ADU rules?
Yes. The state eased approval and size rules, but you still go through plan check and inspections. Your city runs its own setback, height, and floor-area review, and unincorporated parcels permit through LA County. We handle that process with you.
Home Additions & ADUs Planning GuidesCost breakdowns, permits & inspection checklists.
Related Remodeling & Outdoor ServicesPasadena & San Gabriel Valley General Contracting.
Verified Google Reviews5.0-Star Pasadena & SGV homeowner feedback.
Hired Mike and his crew to redo our entire backyard and driveway. Removal of the asphalt and existing landscaping, running water lines and electrical, artificial grass, plant borders, a paver driveway, raised the patio gazebo, added a paver patio, landscaped borders, irrigation and outdoor lighting.
Teri CraftLocal Guide · 33 reviewsFrom start to finish the job was handled with the utmost professionalism and attention to detail. What stood out most was their communication. Mr. Ward kept me informed every step of the way.
Angela Adams5 reviewsMKW Homes just painted our home. We are very satisfied with the work. During the process everything was clean and organized.
Jake Baloian3 reviewsMike and his crew were great. They did a wonderful job on the stucco patching and painting, and we were very pleased with the results.
Jen B1 review
